top of page
20190913_095111_edited.jpg

Aeroton 1.4 Megaliter Tower

Project Status: Completed

Project Duration: 12 Months

Project Cost: R31M

ABOUT THIS PROJECT

The project entailed the construction of a 1.4Mℓ Water Tower complete with high lift pump station and interconnecting pipework in Aeroton.  The project will reduce Rand Water’s direct feed into the reticulation network and ensure adequate storage within the water sub-districts to cater for future water demands.

Aeroton Tower (7).JPG
Aeroton Tower (12).jpg
Aeroton Tower (14).jpg

The tower will improve bulk distribution into the network and improve dynamic pressure to the higher-lying areas within the supply zone, currently being fed directly from Rand Water.

IMG_20200702_105930.jpg
DJI_0258.JPG
IMG_20200618_130904.jpg
DJI_0264.JPG
bottom of page